WQTS, Inc.
   
 
Home
space
About WQTS
space
Services & Projects
space
Staff
space
Facilities & Equipment
space
On-Line Models
space
Important Links
space
Publications
space
Presentations
space
Regulatory Documents
space
Employee Opportunities
space
Contact Us
City of Brentwood, California
Development of Distribution System Monitoring and
Operations Plans

 


 

The City of Brentwood had experienced rapid population growth and needed to update their bacteriological sample siting plan to incorporate new facilities and new regulatory requirements. WQTS was retained by the City to update their sampling plan. At the same time, the City had converted its residual disinfectant from free chlorine to chloramine. As part of the conversion, a monitoring and control plan for nitrification in the distribution system was needed. WQTS developed both water quality monitoring plans together to ensure optimal use of staff and laboratory resources. Also, WQTS has worked with the City to develop an overall, system-wide operations plan incorporating additional elements such as well and pump station operation and maintenance. Finally, WQTS has assisted the City in updating their Security Vulnerability Assessment.

 
Copyright WQTS, Inc 2006 | Los Angeles, CA | All rights reserved | info@WQTS.com
Site Design: JM Design